The maker frequently consists of 1, framework components 2, dealt with jaw plate, 3 movable jaw plate, 4, relocating jaw, 5, eccentric shaft, 6, toggle plate, 7, Change Seats, 8, Artificial sand washer Track components, 9, Lubrication components, 10, Base part, 11, Electric parts The maker electrical motors is the power, through the motor wheel groove by triangle natural leather belt and eccentric wheel drive shaft, make the relocation jaw predetermined tracks reciprocating activity, which will go right into a fixed jaw plate, activities and jaw plate edge guard board structure of damaged chamber shall be damaged, as well as with all-time low of the discharging mouth will certainly be completed materials education. structure parts Jaw crusher framework in the job is a lot the influence load, Hydraulic cone trio crusher wear as a result, it should have adequate strength as well as tightness. Frame for welding (small jaw broken for steel spreading). The framework before with the taken care of screw fastening wall jaw plate; The right as well as left side wall surface screw attaching with within top of the guard board as well as under guard board taken care of jaw plate architectural attribute Move for whole top quality cast steel framework jaw, which place such as the openings as well as slot after great machining and also examination, to guarantee that work safety as well as trusted. Eccentric shaft for high top quality high toughness steel building, after several sophisticated machining, warmth treatment, as well as testing check is made, so have the sufficient toughness and also rigidity Birthing the four collections of dual row round roller birthing to the heart, with good carrying and automated change the efficiency of the heart.
Activities jaw plate and dealt with jaw plate are high quality high manganese steel castings, to extend the life span, its shape style right into, Artificial sand washing machine, raymond mill and also other devices are the stone squashing devices, under symmetrical, particularly can turn around after using end use flywheel and also ports for excellent quality cast iron wheel parts, the weight as well as framework sufficient to guarantee that broken equilibrium feature. Fly slot in prejudice axis on wheels at both ends of the position can mutual exchange, and via the lhe swelling set of link Move jaw components assembly procedure prejudice axis, bearing two as well as kerosene tidy, as well as then two block oil frying pan set up in both ends of the partiality axis. Two bearing in 80-100 ℃, warm the oil for around 15 minutes, measurement of bearing the inner circle hole than prejudice axis neck 0.15, eliminate and warm embed in both ends of the prejudice axis, with pressure stand up to bearing to that of the shaft shoulder close till totally cooling down bearing until now, and also the space shall not be more than 0.05 matches finishing tidy, in birthing with 50%-70% oil.
China spiral classifier, China spiral classifier as well as various other devices are the rock crushing tools, mount sediment move jaw side of the paper, through cover washer and so forth, as well as screws currently, will certainly relocate jaw hole shaft to put, make pack good through completion cap down, as well as will certainly then prejudice axis setting up elements right into the relocate the jaw hanging, lifting when must take note of: eccentric shaft and also vibrant jaw hole center line constant, placed are bearing layer, first light pressure prepared to overview, even when the pressure of the gradual, can knock continual pressure. (can not make use of hammer, ought to remain in birthing on birthing pad, then put tongbang knock tongbang); When the very first only after the 2nd pushed right into the bearings with only when the program after above bearings, in birthing with 50%-70% of the grease, as well as finally to mount sediment in the other side of the paper, with cover floor covering, and screws.
After the install sediment ought to make bearing outer ring end face and via cover end have 0.2 0.4 gap, he is via the correct amount of gasket enter paper C. the tricks are offered in the keyway of prejudice axis within, and are offered in internal maze with cover, take notice of in the best instructions, take the various other two bearing, kerosene tidy, the tight collection bushing in birthing hole, and also to install in eccentric shaft, according to structure the batter round nut, have a look at the washing machine. Take note of have left, eccentric shaft dextral string, the function is eccentric shaft rotates round the screw nut ought to make the tight, eccentric shaft screw initially rounded nut, makes the firmly set bushing, after that tighten up established bushing circle nut, make birthing inner circle by limited securing ring, so repetitive a number of times, the bearing tighten, the tight collection bushing circle nut gave up, to that of the bearing clearance for 1 mm inner circle around (remove the bearing, the very first loosened eccentric shaft circle nut to spin securely on the established bushing round the bearing can be gotten rid of nut) to check out the size of the gasket tooth pushed right into the tight collection specifically on the bushing round nut slot as well as tighten,
Mobile crushing terminal, China magnetic separator, China magnetic separator and also various other equipments are the major ore clothing devices on the marketplace. after that in bearing with 50%-70% decorate oil, Jaw breakers, Jaw breakers, Jaw breakers and other makers are the primary ore clothing equipment on the market. once more individually in polythene via to the inner cover.
D Fly slot round of installment The fly wheel and also lhe swelling set port (or key) in eccentric shaft, fly, groove wheel as well as prejudice axis mark after tightening up the bolts on lhe swelling collection, each bolt tighten pressure for 190 n. M, raymond mill, raymond mill as well as various other devices are the sand making devices, then loaded the shaft obstruct the circle (note: fly container gear, when setup, stay clear of by all means ductile cast iron hot collection) port wheel is installed in standard partiality axis at the left (dealing with the feeding port instructions), also can according to the demand to make the fly, storage tank round the setting. Cubits as well as change parts board Cubits plate is with precise computation of iron spreading components it not simply power transmission elements, yet additionally in the specialized insurance parts. When crusher can't damaged in the material right into the machine than normal lots, cubits board quickly break, China spiral classifier, Iron ore concentrator and also various other equipments are the sand making equipment, crusher to quit functioning, and hence to avoid the entire device damage cubits board as well as cubits by rolling get in touch with board pad, under typical use rarely rubbing, just in the get in touch with surface area coated with oil can.
Change the parts is utilized to readjust the discharging mouth dimension, and payment jaw plate cubits board as well as cubits board between the firms put on pads Adjust the constructing of the components of a process Cubits board mat via the bolts as well as angles adjust seat, readjust the gasket in a frame as well as modification in between, and in sustaining structure, the roofing system bolt (or hydraulic and prompt up leading machine) via the nut or can adjust seat padding against via change, adjust the above a wedge via with the link, the top screws or immediate and also hydraulic up top maker can contribute alone modification.
When adjustment discharging product, the first moderate loosen up tight parts bars nut, as well as loosen the springtime, and then loosen wedge block bolts, and also loosen the wedge block, tighten up top bolt, (or placed on top of the hydraulic head into the batter after the immediate, frame, within hydraulic nuts in addition to the equipment provides oil shutoffs open, pull (deal with) up top screws or push onward change seat immediate, to attain a specific KaiKouDu, take change gaskets, in order to attain the requirement to raise discharging mouth; If in modification gaskets, might be to decrease the requirement of releasing mouth to the individuals in discharging mouth after the size, initially relax top bolts (can open the top of the device JinYou hydraulic valve, throw, loosen up the immediate) change a relocating parts of the dead weight jaw thrust impact, readjust seat and readjust gaskets to close the back wall of frame, compaction, pay attention to the leading screws or immediate loosen level must attain modification positioning the back wall surface attracts close, compacted and not in call, after that tighten the wedge block bolt, will adjust a wedge as well as with the company, moderately tight bars nut tightening springtime, currently completed releasing mouth change.
Taut parts Tighten components is made use of to ensure the whole mechanical crusher very closely, as well as part of the equilibrium in the dynamic jaw and cubits board generated when work force is tighten the setting up of the parts of a process: One end of the pole hinged on the bottom of the dynamic jaw earrings, as well as the other end via the gasket assistance on the frame the reduced end of the back wall surface, springtime with its on both ends of the washer and nut pressure. Crusher job requires a specific springtime of preloaded pressure to avoid cubits board at job, diminish, however shoulds not be too huge, as long as can get rid of cubits board with move jaw, readjust the impact in between elements can be sound, otherwise it will certainly affect the service life of the springtime, and also also make springtime break Track components The tracks via the anchor bolts in reinforced concrete foundation. Electric motor set up in track, installed into the network of the tracks bearings, according to the degree of the triangle natural leather belt practical change of host motors and also distance, when the distance is figured out, make use of in the change on the bearings attaching screw against the base of the electric motor.